click images
to enlarge
 |
The
sidewalk is ready to be poured. |
| Close up
detail of curb that was poured prior to support the soil under the
children's little playground. |
 |
 |
Another
curb that tapers at both ends and the basement stairwell are complete.
The cement mixer is in position. |
| The chute
is wetted down.. |
 |
|
 |
..for the
mud slide. |
| The drains
by the red door have been rebarred and duct taped prior to delivery of
this first wheel barrow of concrete. |
 |
|
 |
Spreading
the concrete out. |
| One drain
is soon out of site. |
 |
|
 |
The
workers work their way back to the alley keeping everything smooth. |
The cement
mixer is now brought into the parking lot to pour the walkway from the
red door out along side the Perry-Armstrong addition. Below the chute is
set up for the task.
uickTime
Video
Cement Mixer in action |
 |
|
 |
 |
|
 |
At left
smoothing out and adding texture for traction. Below, a handy tool for
smoothing from afar. |
| |
 |