Banner that reads: The First Presbyterian Church of Irwin

The Kitchen Remodeling Part 4
Everything in Place

click images to enlarge

Electrical, light fixtures and  reworked plumbing in the entry room where the refrigerator and freezer will be located.

The light switches shown to right are lit when off, making them easy to find in the dark.

Light fixtures are in place.

Below with the cabinet and drawers in place, Myron examines the corner where the pantry cabinet will go. A niche in the cabinet unit shown will house a microwave oven. To the right, cabinets and countertop in the entry area across from the refrigerator and freezer.

Below Myron sawing away with one of the first cordless saws.

uickTime Video
Sawing
Notching to fit

Carl and Myron installing drywall above the cabinet unit.

The drywall is shaped to fit around the pipes

Later tape and spackle will smooth out the joints and screw holes for painting.

The metal railing supporting the drywall has been installed previously across the width of the kitchen.

The drywall is done. Fred Burk and Carl look at the next steps in the process. These include: installing drop down tiles for under the drywall framework and framing in the pantry cabinet unit and electrical panel on the left. Also due in is the hood hardware (800 lbs worth) for the stove.

Grinding it Out

Back

 

Home

Church
Education
Fellowship
Ministry
Music

Featured News & Events

Upcoming
Archive

Calendar
Site Map


in the year of our Lord